Tandem Accelerators

  • Home >
  • Search List
 

 

 ● Front part of the tandem accelerator

  

 

 ● 4 beamlines of the tandem accelerator

  



 

 

 

 

Operation Manager

      Name : Jun Kue Park          e-mail : jkuepark@kaeri.re.kr          Tel : 82-54-750-5308

 

  

 

 Spectroscopy

 Particle-induced x-ray emission (PIXE)

 Application

 Surface analysis

 Probe beam

 1H

 Detection

 Si(Li) Detector 

 Main purpose

 Trace quantitative elements anslysis in the material

 

 

 

Operation Manager

      Name : Jun Kue Park          e-mail : jkuepark@kaeri.re.kr          Tel : 82-54-750-5308

 

  

 

 Spectroscopy

 Rutherford backscattering spectroscopy(RBS)

 Application

 Surface analysis

 Probe beam

 4He 

 Detection

 Surface barrier detector

 Main purpose

 Quantitative analysis depending of the depth of the material

 

 

▶ Operation Manager

      Name : Jun Kue Park          e-mail : jkuepark@kaeri.re.kr          Tel : 82-54-750-5308

 

 
 

 

 Main purpose

 Implantation of variousion beams

 Probe beam

 1H, 4He, etc

 Energy

 Max. 2.4 MeV for 1

 Beam current

 ~1 uA for 1H

 Main purpose

 Single crystal, thin film, etc

  

 

▶ Operation Manager

      Name : Young Seok Hwang          e-mail : hys@kaeri.re.kr          Tel : 82-54-750-5311

 

  

 

 Beam

 1H

 Neutron flux

 107n/str./s at 0 degree

 beam bunch length

 1~2 ns 

 Target

 sLi, sH

 Main purpose

 Formation of nuclear data sheets